3DCoin (3DC / Project Districts) v0.15 Fork at block 800k with masternodes update
October 30, 2019 12:00 AM - November 3, 2019 12:00 AM [Possible Date]
THIS EVENT HAS FINISHED
1.5 ETH GIVE AWAY CONTEST
Join our Telegram channel @kryptocal and you will be enrolled in the giveaway. more details
Event Stats

3
Real

0
Fake

231
views

0
email alerts

  • 100% Complete

  Its Real   It's Fake
Event Details
Category:


Time Zone
UTC

Created Date:
September 21, 2019 8:07 AM UTC



Donate to contributor
BTC: 1B28hvV9VoBpsucfL1LUXAbwbRB86ErQmo

ETH: 0x0390Ed2ba7344793DE8d2b04666750546a294De0

NEO:Ad3q9h7BHnDKE3fYiuSVd6KANYcAAUzfNJ

IOTA: VLDLYZNCGSXSSJGVTWNBJSBXIVV9QMZWSPXBVOEBDOKQBDKTXNCLAYI9HAYGVOBWWU9ACJMNAGAXBABHDDTQXO9KWD
Source/Proof Url:
https://kryptocal.com/r/30704

At the 800k block height that will be reached near the end of October / beginning of November, the 3DCoin masternodes network now with over 8k enabled nodes will activate the v0.15 fork introducing the first industry "masternode temporary collateral" concept (simultaneously with the increase from 1000 3DC to 25k 3DC of collateral required for the activation of a new masternode) and leading the way to the specialized Primenodes, support for smartscripts and many new features that bring 3DCoin / 3DC (Project Districts) more than six months after the successful activation of the first industry "full masternodes only" (no POW, no POS) consensus "Proof of Sync" to mark another step forward for "masternode technology" and blockchain technology. All this in anticipation of the final 3DCoin main goal that will be to create the largest and most decentralized infrastructure for dapps in 3D / VR / AR / MR / XR for the Project Districts platform.